摘要
马钢二铁厂 4#高炉大修投产后 ,通过采取改善炉料结构 ,增加风量 ,提高风温 ,进行富氧大喷吹 ,以及加强管理等 ,高炉冶炼不断强化 ,利用系数逐月上升 ,2 0 0 10 4达到 2 90
The smelting was intensified at No.4 blast furnace in the No.2 Ironmaking Plant of Magang after blowing in. The utilization factor is increasing gradually and beat a record of 2.902 in April, 2001, after taking measures such as improving the charge materials, enhancing the blast capacity, increasing the hot blast temperature, injecting coal with oxygen enriched blast air and strengthening the management etc.
出处
《包头钢铁学院学报》
2001年第4期362-364,共3页
Journal of Baotou University of Iron and Steel Technology
关键词
高炉
强化冶炼
炼铁
blast furnace
intensified smelting
measures
management