广州市花都区万达文化旅游城B1区位于地质复杂、岩溶发育地区,见洞率非常高。SMW工法桩在施工前需要提前对溶土洞进行处理,砂层厚的地质条件下,严格控制水泥浆比重、提高水泥用量等方法,取得较好的效果。
B1 district,wanda cultural tourism city.huadu district,guangzhou city.is located in the area with complicated geology and karst development.SMW engineering piles need to be treated in advance before construction.Under the geological condition of thick sand layer,the method of strictly controlling the proportion of cement and cement and increasing the dosage of cement are achieved.
作者
李博
曹巍
何伟聪
李舜
何嘉俊
Li Bo;Cao Wei;He Wei-cong;Li Shun;He Jia-jun
出处
《建筑技术开发》
2018年第20期31-32,共2页
Building Technology Development
关键词
SMW工法桩
土溶洞处理
砂层厚
三轴搅拌桩
复杂地质
型钢
SMW engineering piles
soil cavern treatment
sand layer thickness
triaxial mixing pile
complex geology profile steel