介绍了百色水利枢纽工程开工爆破中非电毫秒差起爆网路的设计和施工过程 。
The design and implementation process of non-electric millisecond delay detonation circuit of blasting for starting the Baise Key Water Control Project are introduced. The reliability of the non-electric circuit and the influence of flyrock on the circuit are analyzed.