摘要
根据某工程的需要,对于其竖井提升提出了4种设计方案和8种竖井提升方法,通过分析,建立了优化模型,利用计算机技术,输入并随机调整参数,使方案设计指标达到最优值。
According to the needs of a project, the author puts forward four kinds of design scheme of shaft hoisting and eight kinds of shaft hoisting method, establishes the optimum model, inputs and regulates randomly the parameters by use of the computer technique to make the index of the scheme layout achieve optimization.
出处
《矿山机械》
北大核心
2002年第2期40-41,共2页
Mining & Processing Equipment