德州卷烟厂 6 5t锅炉房底层构件由于常年受到水蒸气和二氧化碳的侵蚀 ,出现混凝土脱落和钢筋锈蚀现象。加固设计的原则是在原构件补强的同时对钢筋阻锈处理。
The first floor components in Dezhou Cigarette Factory were eroded by water vapour and carbon dioxide.This results in the peeling of concrete cover for the components and corrosion of steel.Main method of strengthening design is compensating the steel corroded and resisting corrosion.