舟山发电厂125MW机组的除氧器水位和凝汽器水位自动控制,由于两水位的藕合问题一直无法很好的解决,致使自动控制不能长期投运。本文采用了系统水位的概念,解决了这一问题。
The deaerator and condenser level control system of 125MW unit in ZhouShan power plant, can抰 put to automatic because the couple of two level can抰 be solved. This paper proposes a method to solve it by using conception of system level, the control system has good performance which made this automation long and stable running.