摘要
根据变电站电抗器的接线布置实例 ,对几种常用干式空芯电抗器的暂态过程进行了理论分析 。
Based on actual reactor collections on some transformer substations, several transient processes of dry type air-core reactors are analyzed in this paper, some problems in manufacture and running of reactor are also presented.
出处
《高电压技术》
EI
CAS
CSCD
北大核心
2002年第1期52-53,共2页
High Voltage Engineering