2002年三峡工程建设难度和阶段验收

Difficulties in Construction and Phased Acceptance '2002
在线阅读 下载PDF
导出
摘要 In 2002, construction of the Three Gorges project is characterized by its too high workload in installa-tion of metal structures and units following the concrete placement, especially in erection and test and regulation of metal structures, and installation of main components of units. Just before the rush time for operation of the units with construction of the project simultaneously, the preparatory work for the phased acceptance and management must be developed widely. The incidents and defaults in construction quality must be inspected, analyzed and treated in earnest prior to acceptance and impoundment of the reservoir. The removal of the up and downstream cofferdams are being ex-ecuted smoothly, but more attention shall be paid on the cleaning of the construction pits where there are still a great number of rocks to be excavated. The processing control and factory inspection shall be supervised. The field erectionand test and regulation shall be arranged elaborately. This year most of the metal structures incorporated with update technology will be in the test and regulation stage. The project acceptance is not only an essential procedure legally, butalso an overall inspection of the works. In 2002, construction of the Three Gorges project is characterized by its too high workload in installa-tion of metal structures and units following the concrete placement, especially in erection and test and regulation of metal structures, and installation of main components of units. Just before the rush time for operation of the units with construction of the project simultaneously, the preparatory work for the phased acceptance and management must be developed widely. The incidents and defaults in construction quality must be inspected, analyzed and treated in earnest prior to acceptance and impoundment of the reservoir. The removal of the up and downstream cofferdams are being ex-ecuted smoothly, but more attention shall be paid on the cleaning of the construction pits where there are still a great number of rocks to be excavated. The processing control and factory inspection shall be supervised. The field erectionand test and regulation shall be arranged elaborately. This year most of the metal structures incorporated with update technology will be in the test and regulation stage. The project acceptance is not only an essential procedure legally, butalso an overall inspection of the works.
作者 王家柱
机构地区 中国三峡总公司
出处 《中国三峡建设》 2002年第2期16-18,52,共3页 China Three Gorges Construction
关键词 2002年 三峡工程 工程验收 水轮发电机组 difficultyl phased acceptance metal structure unit erection test and regulation.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部