摘要 三峡永久船闸是深切山体建造的 ,开挖形成了双向岩石高陡边坡 ,其规模巨大 ,由此带来的边坡稳定问题引起世人普遍关注。回顾高边坡施工开挖 6年中发生的边坡成型困难、岩体开裂和塌方等情况 ,及研究采取对策、解决问题的过程 ,对岩体开裂和塌方等问题的原因进行了岩石力学分析 ,提出了几点经验 ,可供其它类似工程参考。 The Three Gorges Project permanent lock is constructed by deeply cutting off the rock mass in mountain.The high and steep rock slopes of both sides were formed.The maximum excavated depth reaches about 170 m.In view of their enormous scale,the slope stability problems attract wide attention in the engineering society.This paper gives a brief review on the problems occurring during the lock evcavation in 6 years,such as the difficulty in keeping the designed configurations of the slopes in blasting,rock cracking,collapse and rock block sliding etc..To solve these problems a serries of investigations and discussions have been conducted and remedial measures adopted.Based on the above mentioned,in this article an overall analysis on the causes and mechanisms of these problems is performed.Some understandings and experience are outlined as referenec for other similar rock projects.
作者 董学晟
机构地区 长江科学院
出处 《长江科学院院报》 CSCD 北大核心 2001年第5期48-52,共5页 Journal of Changjiang River Scientific Research Institute
关键词 岩石力学 永久船闸 边坡开挖 失稳破坏 锚固支护 rock mechanics Three Gorges Project permanent lock slope excavation failure in stability anchorage and support
  • 相关文献

参考文献4

  • 1薛果夫,三峡工程永久船闸直墙段块体分布与稳定性专题报告(阶段性中间成果),1999年
  • 2吴海斌,永久船闸高边坡工程实施综述,1999年
  • 3许佐龙,永久船闸开挖锚固及有关问题情况汇报,1999年
  • 4长江水利委员会三峡勘测研究院,三峡工程地质条件综合评价,1998年

同被引文献21