对龙滩碾压混凝土坝最佳开工日期及防渗面板的施工日期进行了研究。最佳开工日期的选取可有效地降低坝体的最大应力 ;
The optimal starting date of constuctrion of Longtan RCC dam and faceplate are studied in this paper for the purpose of avoiding seepage. Maximal stress of dam can be reduced effectively by choosing optimal date to start work.Seepage can be avoided by means of placing faceplate at adequate date after the construction of dam.