摘要
针对枣木水库溢洪道侧堰、低堰、陡槽弯道、挑流消能等特点 ,结合模型实验成果 ,采用新的洪水标准 ,进行结构安全复核 ,对溢洪道安全作出评价 。
According to the feathers of the spillway of Zaomu reservoir such as side weir,low weir,chute and ski jump energy dissipation,combined with the result of model experiment,we adopted the new flood standard to recheck the structure and made the safety accessment of spillway.At last,this paper put forword the relevent measurement and suggestion.
出处
《江西水利科技》
2001年第A01期35-38,共4页
Jiangxi Hydraulic Science & Technology