本文介绍了 1 60 0口径、长 1 856m污水排海管道一次连续顶进到位的施工应用技术 ,阐述了顶管施工的主要设备系统的选型、污浆减摩、顶进施工等关键技术。
Introduced in this paper is the construction technique for continuous jacking into position at one length of a 1600 1856m long sea outfall sewer, including the key techniques for selection of main equipment, friction reduction with slurry and jacking process.
出处
《中国市政工程》
2001年第2期48-50,共3页
China Municipal Engineering
关键词
海底
排水管道
超长距离
顶管施工
seabed drainage pipeline
super long distance
pipejacking construction
critical technique