摘要
通过对老电站三台机组更换水轮机转轮和发电机线圈 ,说明对发电机组增容改造不但可以提高老机组的发电能力 。
It is proved by the replacement of turbine runners and generator coils of three units in an old powerstation,that up rating of generating units not only can improve the generating ability of old units,but also can produce considerable profits.
出处
《大电机技术》
北大核心
2002年第1期17-19,共3页
Large Electric Machine and Hydraulic Turbine