摘要
低水头水利枢纽对泄流能力的试验精度要求较高 ,一般水工模型试验的精度难于满足工程要求。在分析了造成试验偏差主要因素的基础上 ,提出改进措施 。
Test on discharge capacity for low head hydraulic projects requires higher accuracy which conventional methods cannot reach.In this paper major factors causing deviations during the test are analized and improvement measures are put forward to raise the test accuracy.
出处
《人民珠江》
2001年第6期8-10,共3页
Pearl River
关键词
泄流能力
淹没出流
模型试验
低水头枢纽
泄洪闸
discharge capacity
submerged discharge
model test
low head hydraulic project