利用GIM(1)的非时序直接建模法预测研究建筑施工的环境振动 ,并将GIM(1)模型与GM (1,1)模型进行比较分析 ,结果表明GIM(1)模型的拟合精度优良 ,对原始资料中白化信息的利用更加丰富 ,拓宽了GIM (1)
Using the method of non time sequence direct setting up, it caculates the theoretical values of environmental vibration in building construction and compares GIM(1) model with GM(1,1) model. The results show that GIM(1) model has higher fitting accuracy and utilizes more known informations in the original data, and widens the application scope in the field of environmental science.