摘要
分析计算设计洪水有多种方法。历史洪水是当地历史上曾经发生的 ,应用历史洪水调查可以提高设计洪水计算精度。本文根据历史洪水调查对某厂址进行设计洪水计算 。
There are many methods to calculate design flood.Historical flood is the flood that has occurred in the local area.Using historical flood investigation can improve the calculation accuracy of design flood.In this paper,the historical flood investigation is applied to design flood and satisfactory results are given on a power plant area.
出处
《山东电力技术》
2001年第6期50-52,共3页
Shandong Electric Power
关键词
历史洪水
调查
计算精度
设计洪水
Historical flood investigation Calculation accuracy Design flood