10MW高温气冷实验堆工程标准化的管理 被引量:1

Engineering standardization control for 10MW high temperature gascooled reactor
原文传递
导出
摘要 从 10 MW高温气冷实验堆 (HTR- 10 )工程实践 ,总结实验堆工程标准化的管理经验。组织保证和增强标准化意识是实施核工程标准化管理的必要前提。重点阐述了 HTR-10的设计、制造和建造阶段所采取的标准化管理措施和实效。该工程实践表明 ,实施核工程标准化管理是保证工程质量和工程进度、提高投资经济效益的重要手段之一。期望能为其他实验堆、研究堆等核工程提供借鉴 。 Experience with the 10MW high temperature gascooled reactor (HTR10) was reviewed to standardize control of the test reactor. Organizational emphasis and awareness of standardizations are necessary prerequisites for nuclear engineering standardization control. The paper analyzes standardization control measures in the design stage, the manufacture stage and the construction stage for HTR10. Engineering experience indicates that carrying out standardization control in nuclear engineering projects is a key method for ensuring engineering quality and progress and improved economic benefits. The conclusions provide a reference for other nuclear engineering research reactors to improve nuclear engineering standardization control.
出处 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2001年第10期58-61,共4页 Journal of Tsinghua University(Science and Technology)
基金 国家"八六三"高技术项目 ( 86 3-6 14 -0 2 )
关键词 核工程 高温气冷实验堆 标准化管理 设计阶段 制造阶段 建造阶段 HTR-10 nuclear engineering high temperature gascooled reactor standardization
  • 相关文献

参考文献3

二级参考文献4

  • 1Zhong daxin,IAEA-TECDOC-784,1995年,11页
  • 2王大中,核科学与工程,1993年,13卷,4期,2页
  • 3徐元辉,核科学与工程,1993年,13卷,4期,8页
  • 4崔树安,标准化指南,1991年

共引文献2

同被引文献27

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部