摘要
金川二矿区的膏体充填系统于 1991年开始建设 ,1999年 8月生产试运行成功 ,并通过了国家有色金属工业局的鉴定。本文对该系统的试运行作了概括介绍 。
The construction of the paste backfill system in Jingchuan's No.2 Mining District began in 1991. In August 1999 the pilot operation succeeded and passed technical appraisal by the National Bureau of Nonferrous Metals Industry and was commissioned ever since. This paper introduces the pilot operation of the system and discusses the problems found in the pilot operating process.
出处
《矿业研究与开发》
EI
CAS
2001年第3期21-23,共3页
Mining Research and Development