摘要 南芬露天矿坑底线已达到 346m水平 ,按矿山改建设计的要求 ,2 90平硐矿石运输系统应停运 ,启用新的运输系统 ,新系统每年将增加约 2千万元的运输费用。为降低矿石运输成本 ,对延长 2 90平硐服务年限的可行性进行了研究。研究内容包括地质调查、支护技术和露天开采综合技术等。研究结果表明 ,延长 2 The baseline of the pit bottom has reached 346m level in Nanfen Surface Mine. As required by the design of mine innovation, the ore haulage system at the 290 level adit should be decommissioned and a new transportation system should be installed. In that case, an additional 20 million yuan transportation expense will be incurred annually. In order to cut transportation cost, a feasibility study is carried out with regard to prolonging the service life of the 290 level adit. Research projects include geological survey, support technology and surface mining. The research results show that it is feasible to extend the service life of the tunnel.
机构地区 南芬铁矿 东北大学
出处 《矿业研究与开发》 EI CAS 2001年第3期12-14,共3页 Mining Research and Development
关键词 平硐运输系统 运输成本 服务年限 南芬露天矿 地质调查 支护技术 Adit transportation system Transportation cost Service life
  • 相关文献

参考文献3

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部