摘要
介绍厦门海沧港区#2泊位ZPMC装卸桥后轨冲孔灌注桩施工工艺、施工监理过程控制、质量检测结果及体会。
The construction technology, control of construction supervision process, qualityinspection result and understandings to impact - cone concrete pile of ZPMC loading bridge backtrack of Xiamen Haicang # 2 Berth are introduced.
出处
《水运工程》
北大核心
1999年第12期68-69,共2页
Port & Waterway Engineering