摘要
针对哈尔滨第三发电有限责任公司对 6 0 0MW机组锅炉二次风存在的漏风原因分析 ,得出主要是膨胀位置设计不合适及膨胀节选型不当引起 ,经过重新设计及更换非金属膨胀节后运行效果良好。图
Factors that caused secondary air leakage in the boiler of Harbine No.3 Power Generating Co. Ltd.'s 600MW set are analytically discussed, with the conclusion that the expansionary positions were net designed appropriately and a wrong type of expansion joint had been chosen. Operation get satisfactory after the design has been redone and the expansion joint exchanged for a non metallic one. Figs 2 and refs 2
出处
《发电设备》
2001年第4期9-10,共2页
Power Equipment