摘要
结合黑白水三级电站隧道的施工实践,采用多种不同施工方法对隧道在高温高压热水条件下的降温技术。
In this paper, various kinds of construction methods which have been taken in Heibaishui ladder -shaped power station tunnel are introduced, and the temperature lowering technique for hot water with high pressure are discussed.
出处
《现代隧道技术》
EI
2001年第3期48-50,共3页
Modern Tunnelling Technology