摘要
详细介绍了大石河铁矿尾矿库加高设计中筑坝材料参数的试验研究 ,并对坝体稳定性进行充分论证 ,确定了合理的设计方案 ,工程实施后 。
The experimental study of material parameters for heightening design of tailing dam of Dashihe iron mine was introduced in detail, full demonstration of the dam stability was given, and the reasonable design scheme was determined. After the implementation of the project, the remarkable comprehensive benefits were obtained.
出处
《冶金矿山设计与建设》
2001年第4期24-31,共8页
Metal Mine Design & Construction