摘要
简要介绍了深圳市长城春风花园深基坑支护工程概况 ,并就其预应力锚杆和地下连续墙联合支护设计。
A summary about supporting engineering of deep excavation in Great Wall Chunfeng Garden in shenzhen is introduced.The joint supporting design of prestressed anchor rod and diaphragm wall,the element test of anchor rod and the construction procedures of this engineering are also introduced herein.
出处
《建筑结构》
CSCD
北大核心
2001年第4期41-43,共3页
Building Structure
关键词
深基坑
支护
预应力
锚杆
地下连续墙
supporting in deep excavation
prestressed anchor rod
diaphragm wall