摘要
根据上海市地铁共和新路高架工程电力监控系统技术规范,提出系统总体方案设计。包括系统构成、软硬件配置、系统功能等。并讨论了本系统与原地铁1号线SCADA系统的接口问题。
According to the technical requirements of Power Supply SCADA in Shanghai Gonghexinlu Rail Transit, this paper presents a total soultion which includes system configuration of software, hardware and system function etc. The interface with the old SCADA is also discussed in this paper.
出处
《城市轨道交通研究》
2001年第2期57-60,共4页
Urban Mass Transit