期刊文献+

宁波招宝山大桥加固重建工程新旧混凝土共同受力模型试验研究

Model Test Study of New Concrete Participate in Taking Load Together with Old Concrete on Ningbo Zhaobaoshan Bridge Strengthening Plan
在线阅读 下载PDF
导出
摘要 宁波招宝山大桥加固方案中 ,原箱梁底板与腹板内侧新增 2个劲性钢筋混凝土小梁 ,为研究新旧混凝土共同受力情况 ,进行了模型试验。介绍了这一试验的分析结果。实验结果表明 ,新旧混凝土能很好地共同承受轴向压力 。 In Ningbo Zhaobaoshan bridge strengthening plan, two stiffened girder were add to the place where the formerly designed base plate and inner wall of web plate of box beam are conjuncted, A model test was done to study whether the new concrete participate in taking loads with the old. The result of the test was introduced, the result of the test demonstrated that the new concrete can participate in taking not only the axial compressive stress but the bending stress together with the old concrete.
出处 《桥梁建设》 EI CSCD 北大核心 2001年第3期35-39,共5页 Bridge Construction
关键词 宁波市 招宝山大桥 预应力混凝土结构 模型试验 加固 受力情况 Zhaobaoshan Bridge in Ningbo prestressed concrete structure model test
  • 相关文献

参考文献1

  • 1朱以文 韦庆如 等.微机有限元前后处理系统ViziCAD及其应用[M].北京:科技文献出版社,1991..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部