三峡水电站“充水保压”钢蜗壳外围混凝土结构三维有限元分析 被引量:30

3-D FEM analysis for surrounding concrete of steel spiral case keeping constant internal pressure
在线阅读 下载PDF
导出
摘要 本文介绍三峡水电站蜗壳结构三维有限元计算结果 ,结果表明 :三峡水电站钢蜗壳选用充水保压浇筑外围混凝土的埋置方式是合适的 ;采用 78~ 88m保压水头值比较合适 ;蜗壳结构各截面最大拉应力值出现在不同荷载组合情况下 ,在配置钢筋时应引起重视 . The calculation result of 3 D FEM analysis for spiral case structure of the Three Gorges Project, under the condition of keeping constant internal pressure, is presented. It is shown that the adoption of keeping constant internal pressure during placement of concrete encasement of steel spiral case is feasible. The suitable internal pressure is ranging from 78 88m. Since the maximum stress in various sections is dependent of the combination of different loads, the reinforcement of the surrounding concrete must be carefully considered in design.
出处 《水利学报》 EI CSCD 北大核心 2001年第6期28-32,共5页 Journal of Hydraulic Engineering
关键词 三峡水电站 混凝土结构 钢蜗壳 三维有限元 充分保压 spiral case surrounding concrete keeping constant internal pressure calculation method FEM analysis
  • 相关文献

参考文献4

二级参考文献6

共引文献18

同被引文献176

引证文献30

二级引证文献137

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部