摘要
以倾斜设备井为采场通道的进路充填采矿法,经过试验,主要指标达到了要求,并在无斜坡道采准等方面取得了经验。
Through trial mining, the access cut and filled stopes method which took inclined raise of equipment conveyance as stope passageway got success attaining desired target.Besides,a certain experience concerning preparatory work without the presence of ramp road was acquired.
出处
《黄金》
CAS
北大核心
1991年第10期22-26,共5页
Gold
关键词
金矿
机械化开采
铲运机
设备井
raise of equipment conveyance
layered-liaison tunnel
micro electric-powered seraper