摘要
小型地下矿山在建设之初,多因地质储量、资金等各种实际问题,先以小规模开工建设,嗣生产一段时间之后,再扩建改造。本文就技术改造程序、资源回收、经济效益等问题进行了较详细的探讨。
The small-sized underground mines are usually constructed due to vague geological resources, shortage of capital fund or some other problems existed.Through a length of time in production and with the change of conditions, the expanding or remoulding of the small-sized underground mines are placed on the order of the day. This paper explores in detail on the technical remoulding procedure, recovering of resources, economic benefit and so on.
出处
《黄金》
CAS
北大核心
1991年第1期24-27,19,共4页
Gold
关键词
小型矿山
技术改造
资源回收
small-sized mine
technical remoulding
recovering of resources
raising of economic benefit