针对哈尔滨第三发电有限责任公司 6 0 0MW锅炉配的空气预热器在运行时存在的问题 ,对空气预热器的各密封系统、支承轴承、导向轴承装置、传动系统、传热元件等部件作了技术改造 ,改造后运行表明效果良好。图
The paper reports on existing boiler problems and improvements performed on various sealing systems, supporting bearings, guide bearings, transmission system, heat transmission elements of the 600MW boiler's air preheater of Harbin No.3 Power Co.Ltd., results of improvement proved satisfactory in operation. Figs 6