摘要
通过分析废弃物老港处置场前 3期工程在实际运用中存在的问题 ,针对当前准卫生填埋场的现状 ,提出 4期工程应在衬底、覆盖和渗沥液处理 3个关键环节上采取的对策。
According to studying the problems existed in the operation of previous three stages engineering in Laogang landfill site Shanghai, China, especially present condition of para-sanitary-landfill, some new strategies are posed with regard to lining、 cover and leachate treatment.
出处
《环境卫生工程》
2001年第1期6-8,28,共4页
Environmental Sanitation Engineering
关键词
上海
废弃物
填埋场
扩建
卫生填埋场
复合衬底材料
植物覆盖
矿化垃圾处理渗沥液
Landfill site enlargment Sanitary landfill site Compound lining material Phytocover Leachate treatment by mineralized refuse