摘要
中远船坞底板采用预填骨料升浆砼新工艺 ,叙述了这一工艺在大连中远 6万t级船坞工程中的应用 。
It describes the application of prepacked aggregate concrete which is a new technique and has been used in the bed plate of Zhongyuan 60 000 dwt Dock. The key techniques employed and the problems encountered during the dock construction are also discussed herein.
出处
《水道港口》
2001年第1期36-39,共4页
Journal of Waterway and Harbor
关键词
船坞
湿法施工
预填骨料砼
坞底板
dock
construction in wet
prepacked aggregate concrete