利用 2 0 0 0 - 0 1~ 0 2洋山港区一期工程港池水域水文泥沙原体观测资料 ,分析研究了工程区水域潮流运动与泥沙分布的特征 ,并由此进一步分析研究了影响泥沙沉速的成因 。
On the basis of hydrographic and sediment data observed from the basin of the first phase project of Yangshan Harbor from Jan. to Feb., 2000, the characteristics of tidal flow movement and sediment distribution in the basin is analyzed. And the cause effecting sediment falling velocity, the floc solution and the deposition were further studied.
出处
《水道港口》
2001年第1期31-35,共5页
Journal of Waterway and Harbor