摘要
在设计长度为 89.8m ,大大超过规范允许的最大长度的建筑物时 ,采取了一系列有效措施 。
The contraction stress and the temperature stress of concrete are controlled by taking a series of effective measures for the building with 89.8m length that greatly exceeds the largest length allowed by specification.
出处
《化工矿物与加工》
CAS
北大核心
2001年第4期21-22,共2页
Industrial Minerals & Processing