摘要
吸收球停堆系统是 1 0MW高温气冷实验堆的第二停堆系统。在 1 0MW高温气冷堆上进行了 7套设备的吸收球输送功能试验验证。吸收球 1 # 至 7# 系统 ,其落球 ( 60s)和回球 ( 2 0 0s)动作正常 ,所用的时间在要求的范围内 ;球位状态指示正常。吸收球系统回路气体流动正常 ,风机的流量、压升正常。 1 2个阀门的开、闭功能正常。以上实验结果达到高温堆验收准则的要求。
The neutron absorption sphere shutdown system is the second shutdown system of the 10MW High temperature Gas cooled Test Reactor. 7 sets of absorption sphere shutdown system equipment are verified on the 10MW high temperature reactor. System parameters including sphere falling down time (60s), conveying time (200s), sphere level indicator, rose motor flowrate, and valves open close state is acceptable. Test result indicates that the absorption sphere shutdown system can satisfy the technical requirements of 10MW high temperature reactor.
出处
《高技术通讯》
EI
CAS
CSCD
2001年第4期96-98,共3页
Chinese High Technology Letters
基金
863计划资助项目! ( 863 614 0 2 )