期刊文献+

输气管线裸露敷设斜穿长江

Oblique Crossing of Yangtze River With Bare Gas Pipeline
在线阅读 下载PDF
导出
摘要 原史坝长江穿越裸露管束三根管道安全运行 1 8年之后 ,相继出现破漏 ,为满足四川合江地区供气的需求 ,重新建设了坝榕线长江穿越工程。该工程经方案论证 ,设计正确地选择了穿越断面、敷设方式、管身结构、稳管措施等 ,体现了安全可靠、经济合理 ,方便施工的基本原则。竣工、试运验收结果表明 ,该工程投资省、工期短、效益好 ,是近几年工程项目管理 ,质量、投资控制好 ,见效最快的工程项目之一。 To meet the gas supply for He Jiang Prefecture in Sichuan,based on summarizing sucessful experience and failing lesson,the project,crossing of Yangtze River at Ba Rong,was built.After demonstrating many plans,optimal cross sectional area,laying plan pipeline body structure,pipeline stabilizing measures were chosen.The project design embodied such basic principles as safely,reliability,economic rationality and easy construction.After completion,test run and ecceptance test,as it turned out,with less investment,shorter construction time and better benefit,the project is one of projects with the best management,the best quality,the best investment control and the fastest coming into operation in recent years.
作者 王毓民
出处 《天然气与石油》 2001年第1期7-10,共4页 Natural Gas and Oil
关键词 输气管线 裸露敷设 长江 施工 设计 项目管理 水下管道 Gas Pipeline barely lay Yangtze River Design Construction Project Management
  • 相关文献

参考文献3

  • 1[1]四川石油设计院.史坝长江穿越施工图设计[Z].1979.
  • 2[2]四川石油设计院.坝榕输气管线长江穿越工程方案设计[Z].1998.
  • 3[3]四川石油设计院.坝榕输气管线长江穿越工程施工图设计[Z].1999.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部