期刊文献+

水轮机调速系统过渡过程时间t_P与引水钢管水流惯性时间常数T_W关系的研究 被引量:1

The study on the Relationship between Time tp of Transient Prccess of Turbine Speed Governing System with Water lnteria Time Constant Tw of Penstock
在线阅读 下载PDF
导出
摘要 通过对现场实测数据的统计分析和理论分析证明,空载工况下,阶跃扰动时,过渡过程时间t_p与引水钢管水流惯性时间常数T_w无关;在满载工况下,阶跃扰动时,调速系统的过渡过程时间t_p与引水钢管水流惯性时间常数T_w呈线性关系。 Under no-load operating condition, and step-disturbance, the transient process time t_p is independent to water in teria time constant T_w of per stock this fact was proved by statistial analysis and theoretical investigation.Under full-load operating condition, and step-disturbance, the transient process time t_p of turbine speed regulating system is proportional to water interia time constant T_w of penstock.
作者 吴应文
出处 《大电机技术》 北大核心 1989年第1期56-62,共7页 Large Electric Machine and Hydraulic Turbine
关键词 水轮机 调速系统 过渡过程时间tp 引水钢管 水流惯性时间常数Tw transient process speed regulating system penstock interia time
  • 相关文献

参考文献1

  • 1吴应文.水轮发电机组空载工况下调速系统整定参数的计算[J]电力系统自动化,1984(06).

同被引文献3

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部