摘要
阐述了江西洪门水电站主坝F11及F2 3 断层防渗帷幕处理的必要性和灌浆材料的特殊性能及主要施工方法 ,提出了灌浆压力的选定方法 。
This paper stated the necessity of antiseepage heavy curtain treatment of F 11 and F 23 faults under the main dam of Hongmen Hydroelectric station,the special property of grouting materials and the main construction method.And it also put forword the method of selecting the grouting pressure and commented on the construction quality.
出处
《江西水利科技》
2001年第1期28-33,共6页
Jiangxi Hydraulic Science & Technology
关键词
洪门水电站
坝基
防渗帷幕
施工质量
Hongmen Hydroelectric station
Bam foundation
Heavy curtain
Construction