摘要 本文结合国外某水运工程测绘项目的实施,探讨了实施过程中,在测绘基础资料欠缺的情况下遇到的两大难题:平面坐标系统和高程基准的确立及实施。系统总结了项目实例中采用的技术方案、实施方案、内业处理和数据分析等技术,可为我国测绘人员在类似测绘项目的实施提供有益的参考。 In this paper,we take an overseas waterway engineering surveying and mapping project as an example to discuss two major problems during the implementation of the project. They are the determination of the plane coordinate system and the elevation datum under the situation that the basic surveying material is lacking. This paper summarized the technical scheme,implementation plan,material processing and data analysis method that were adopted in the sample project. The results and conclusions can provide useful reference for the domestic surveyors in the similar surveying projects.
出处 《港工技术》 2014年第3期82-86,共5页 Port Engineering Technology
关键词 国外水运工程 坐标系统 高程基准 GPS水准 the overseas waterway engineering coordinate system height datum GPS level
  • 相关文献

参考文献5

  • 1李征航,黄劲松.GPS测量与数据处理[M].武汉:武汉大学出版社,2001.
  • 2徐绍铨,张华海,杨志强,等.GPS测量原理及应用[M].武汉:武汉大学出版社,2007.
  • 3张文兵,王朔.RTK技术在高程测量中要点控制[J].地理空间信息,2007,5(3):102-103. 被引量:7
  • 4JTS 131-2012水运工程测量规范[S].北京:人民交通出版社,2012.
  • 5JTS258-2008水运工程测量质量检验标准[S].北京:人民交通出版社,2008.

二级参考文献3

共引文献45

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部