中国高坝工程过饱和总溶解气体研究进展 被引量:3

Research Progress of Supersaturated Total Dissolved Gas Caused by High Dam Flood Discharge in China
在线阅读 下载PDF
导出
摘要 高坝泄洪会导致下游水体总溶解气体过饱和,鱼类长期处于这种环境容易患气泡病甚至死亡。为保护生态环境,找出切实可行的TDG饱和度消减措施,我国针对高坝泄洪导致的总溶解气体过饱和现象开展了大量研究。对高坝工程过饱和溶解气体的产生、释放过程、鱼类对过饱和溶解气体耐受性、TDG饱和度预测模型及TDG过饱和减缓措施的研究成果进行了总结,同时针对已有研究成果的不足提出了建议,旨在为进一步开展研究工作提供参考。 Supersaturated total dissolved gas caused by high dam flood discharge would lead fishes to suffer gas bubble disease. In order to lower the saturation of total dissolved gas and protect the aquatic environment,studies were made in the past decades through prototype measurements and laboratory experiments. This paper summaries the cause and dissipation process of supersaturated dissolved gas,avoidance response of fishes,TDG prediction model and mitigation measures and other respects of high dam projects. Suggestions for future work were proposed.
作者 杨柳 夏哲兵
出处 《四川水力发电》 2014年第3期71-75,172,共5页 Sichuan Hydropower
关键词 高坝工程 泄洪 过饱和溶解气体 研究进展 high dam project flood discharge supersaturated dissolved gas research progress
  • 相关文献

参考文献29

二级参考文献102

共引文献129

同被引文献38

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部