3Lane K F. Commercial Aspects of Choosing Cutoff Grade [C].Proceedings 16th APCOM, 1979 : 280-285.
4Taylor H K. General Background Theory of Cutoff Grade [J]. Transaction, Institution of Mining And Metallurgy, London, 1972 : A 160-A 179.
5Chou Honglong,Chen Zen. Fast octree construction endowed withan error bound controlled subdivision scheme[J].Journal of Information Science and Engineering, 2006(5) : 641-657.
6Barid B K, Satchwell P C. Application of economic parameters and cutoffs during and after pit optimization[J]. Mining Engineering, 2001(4) : 33-40.
7Chou Honglong,Chen Zen.Fast octree construction endowed withan error bound controlled subdivision scheme[J].Journal of Information Science and Engineering,2006(5):641-657.
8Barid B K,Satchwell P C.Application of economic parameters and cutoffs during and after pit optimization[J].Mining Engineering,2001(4):33-40.