基于“4M1E”影响因素的敞开式TBM快速掘进保障措施 被引量:4

Measures to Ensure Rapid Boring of Open TBM Based on “4M +1E”Factors
在线阅读 下载PDF
导出
摘要 TBM施工是一个复杂的系统工程,涉及的专业多、领域广,需要各个制约因素的高效集成,充分确保TBM设备利用率,加快施工进度,是体现TBM优势的关键。将影响TBM施工的各项因素归结为"人、机、料、法、环"5个方面进行研究。结果表明,通过培养高素质的人员管理队伍、保障完好的设备状态加之对材料供应、施工方法、环境控制等方面的科学管理,能够发挥人员的主观能动性、降低施工风险、体现设备的先进性,使快速掘进得以实现。 Tunneling by TBM is a complex and systematic project,which involves many disciplinary fields and has multiple constraints.Ensuring the availability of the equipment and accelerating the construction progress are keys of tunneling by TBM.Factors affecting TBM tunneling can be summarized as "4M + 1E" (Man,Machine,Material,Method and Environment).The study result shows that high-quality management team,good equipment condition and scientific management of material supply,construction methods and environment can bring man' s initiatives into full play,can minimize the construction risks,can make full use of the advantages of the equipment and can achieve rapid boring.
作者 徐赞 谢培才
出处 《隧道建设》 2014年第6期569-575,共7页 Tunnel Construction
关键词 西秦岭隧道 敞开式TBM “4M1E” 快速掘进 保障措施 West Qinling tunnel open TBM "4M + 1E" (Man, Machine, Material, Method and Environment) rapid boring assurance measure
  • 相关文献

参考文献22

二级参考文献84

共引文献354

同被引文献20

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部