根据华北电网与华中电网的预测负荷和电源建设规划 ,对 2 0 0 5年和 2 0 10年进行了联网效益的定量计算 ,并据此推荐了联网规模在 2 0 0 5年和 2 0 10年分别为 6 0 0 MW和 12 0 0MW。
On the basis of forecasted load and generation schedule, the benefit from interconnecting North China Power System with Central China Power System in the years of 2005 and 2010 is quantitatively calculated. According to the calculation result it is recommended that the required tie line capacity in 2005 and 2010 is 600 MW and 1 200 MW respectively.