4Brah S A,Loo L L.Heuristics for scheduling in a flow shop with multiple processors[J].European Journal of Operational Research, 1999, 113( 1 ) : 113-122.
5Moursli O,Pochet Y.A branch-and-bound algorithm for the hybrid flow shop[J].International Journal of Production Economics,2000,64 (1/3): 113-125.
6Wardono B,Fathi Y.A tabu search algorithm for multi-stage parallel machine problem with limited buffer capacities [J].European Journal of Operational Research, 2004,155(2) : 380-401.
7Halln G,Sriskandarajah C.A survey of machine scheduling problems with blocking and no-wait in process[J].Operations Research, 1996,44(3):510-525.
8Sriskandarajah C.The performance of scheduling algorithms for nowait flow shops with parallel machines[J].European Journal of Operational Research, 1993,70(3 ) : 365-378.
9Xie Jin-xing,Xing Wen-xun,Liu Zhi-xin,et al.Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines[J]. Computers & Mathematics with Applications, 2004,47 : 1857-1863.
10Dorndorf U,Pesch E,Phan-Huy T.Constraint propagation techniques for the disjunctive scheduling problcm[J].Artificial Intelligence,2000, 122:189-240.