摘要
详细地介绍了新城金矿盘区上向高分层连续回采充填采矿方法的试验研究成果 。
The experimental study result of panel upward high layer continuous stoping and back filling method was introduced, and technical and economic indices obtained after the method was put into production were also given.
出处
《冶金矿山设计与建设》
2000年第5期6-11,共6页
Metal Mine Design & Construction
基金
国家"九五"重点科技攻关项目