期刊文献+

生活垃圾焚烧发电厂渗滤液处理工程实例 被引量:7

LANDFILL LEACHATE TREATMENT PROJECT IN INCINERATION POWER PLANT
原文传递
导出
摘要 针对城市生活垃圾焚烧发电厂渗滤液COD和NH3-N含量高,常规工艺难以处理达标的问题。针对该水质特点,采用预处理-上流式生物膜滤器(UBF)-浸没式膜生物反应器(SMSBR)双膜4段式组合工艺进行处理。调试运行结果表明,4段式组合工艺处理效果良好,COD和NH3-N去除率极高,出水水质稳定达到GB 18918-2002中一级A标准。 According to the wastewater of leachate with high content of COD and NH3-N concentration, and conventional process is difficult to deal with Pretreatment-Upflow biological membrane filter (UBF)-Submerged Membrane Bioreactor (SMSBR) two-membrane four-stage combined process was used for processing. The operation results show that the combined process has good treatment effect, COD and NH3-N removal rate is high, water quality meet the A standard of GB 18918--2002.
出处 《水处理技术》 CAS CSCD 北大核心 2014年第5期121-123,131,共4页 Technology of Water Treatment
关键词 焚烧发电厂 渗滤液 双膜 incineration power plant leachate two stage -membrane
  • 相关文献

参考文献8

二级参考文献21

共引文献328

同被引文献49

引证文献7

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部