摘要
介绍了已建成并投入运营的杭州地铁1&3号线武林广场站-文化广场站4线交叉重叠盾构隧道的设计情况。分析了工程的重难点及设计应对措施,总结了设计过程中的一些思考和工程的设计创新,为后续类似工程提供借鉴。
This paper describes the design of 4 overlapping shield tunnels ofwulin square station-Cultural Square station section of Hangzhou Metro line 1&3 which has been completed and put into operation, the paper analysis the difficulties and countermeasures,and summarizes the design thinking and innovation,and it will provide a reference for the subsequent similar engineerings.