摘要
依据场地地质条件,结合项目实际情况,对软土地基处理方案进行了对比分析,并对基础设计要点进行了阐述,指出采用刚性桩处理软土地基施工快捷、方案合理,地基承载力检测结果与设计相符,值得推广应用。
According to the geological conditions for the site, the paper compares and analyzes the treatment scheme for the soft soil foundation by combining with the circumstance of projects, illustrates the foundation design points, and points out the rigid pile has rapid construction speed and reasonable schemes in the treatment of the soft soil foundation, and the test result of the foundation loading capacity is consistent with the design, so it can be further applied.
出处
《山西建筑》
2014年第14期69-70,共2页
Shanxi Architecture
关键词
复合地基
软基处理
刚性桩
composite foundation, soft soil treatment, rigid pile