介绍了凌津滩水电厂接地网的分布情况及首台机组发电前主接地网电阻测量的过程 。
This paper introduces the distribution of the main grounding grid in Lingjintan hydropower plant. It also records the process of measurement of resistance of the main grounding grid before the #1 gernerator was put into production The data of the measurement are analyzed.