摘要
介绍了在φ42.5m提升机安装中应用网络计划技术对施工过程进行严格管理与控制,通过优化网络图,根据网络日组织施工,在保质、保量和保安全的前提下,缩短工期,提高工效,有较好的社会与经济效益。
The paper introduces the network planning technology applied to strictly manage and control the installation of gb 2.5m hoist in the process of construction. Through the optimum network draft and under the condition of guaranteeing quality, quantity and safety, the construction period can be shortened and the efficiency can be improved based on the constructions organized by network draft. Social efficiency and economic efficiency can also be obtained well